Roche Constructors completed a two-story, free-standing addition with a basement to Dayspring Christian Academy’s campus.

Project Description

Dayspring’s new K-6 classroom building was constructed on a load-bearing spread footing foundation system with a steel frame/composite slab building frame system.

Roche was also responsible for renovation work at the existing PK-12 building, which included removing a portion of the exterior wall to create a new enclosed vestibule space. A canopy was installed at the new point of entry that matches the entry on the new K-6 building. Also, Roche transformed a classroom to create an office and library media center. Finally, wall finishes, flooring, and acoustical ceiling tiles throughout the building were updated.

Site development included overlot grading, utilities, parking lot paving, site lighting, landscaping, off-site infrastructure, site retaining wall, storm water system, and playground.

Location

3734 W. 20th Street, Greeley, CO

Square Footage

30,874 SF

Site Area

7 Acres

Method

Negotiated Stipulated Sum

Owner

Dayspring Christian Academy

Architect

Hord Coplan Macht

Work with a proven leader in commercial construction.

For over 50 years, Roche Constructors has proudly served regions across Colorado, Nevada, and the western U.S. as a leading construction company.

If you are looking for a contractor that is innovative and prides itself on the lasting trust of its clients and its employees, Roche is the right contractor for your project.

Trusted by over 80
businesses including:

  • This field is for validation purposes and should be left unchanged.

Loading...