North Valley Middle School Renovation & Addition Back to Project List

Location:
300 2nd Avenue
LaSalle, CO

Owner:
Weld County School District RE-1
Gilcrest, CO

Architect:
TreanorHL
Denver, CO

Square Footage: 43,742 SF

Site Area: 5.0 Acres

The scope of work for North Valley Middle School includes renovating the existing 35,000-square-foot school and constructing an 8,500-square-foot expansion.
 
Renovation work for the existing building includes ADA upgrades; new roofing; installing bollards at vehicular service zones and building entry; repairing drainage issues; installing new site safety signage; upgrading the fire alarm system; technology upgrades; installing new window blinds, shades, and light fixtures; new HVAC units and controls; new flooring and paint; replacing windows; and removing the structural spray material in the gym and installing a new acoustical finish material. Most of the renovation work will be completed during the summers of 2018 and 2019.
 
The expansion will be built on a load-bearing spread footing foundation system once we over-excavate and recondition the sub-base and will have a structural metal stud building frame system. The building’s exterior will be a brick veneer that matches the existing school. The new space will be home to classrooms and music rooms.
 
At the start of the project, we will demolish the old North Valley Middle School building, which is nearly 100-years-old and sits south of the main building. It was used as classroom space through the end of the first semester of the 2017-18 school year.
 
Site development includes overlot grading, utilities, landscaping, and storm water system.
 