North Valley Middle School Renovation & Addition Back to Project List

Location:
300 2nd Avenue
LaSalle, CO

Owner:
Weld County School District RE-1
Gilcrest, CO

Architect:
TreanorHL
Denver, CO

Square Footage: 43,742 SF

Site Area: 5.0 Acres

The scope of work for North Valley Middle School includes renovating the existing 35,000-square-foot school and constructing an 8,400-square-foot expansion. 
 
At the start of the project, we demolished the old North Valley Middle School building, which was nearly 100-years-old and was located south of the main building. It was used as classroom space through the end of the first semester of the 2017-18 school year.
 
Renovation work for the existing building includes ADA upgrades; new roofing; installing bollards at vehicular service zones and building entry; repairing drainage issues; installing new site safety signage; upgrading the fire alarm system; technology upgrades; installing new window blinds, shades, and light fixtures; new HVAC units and controls; new flooring and paint; replacing windows; and removing the structural spray material in the gym and installing a new acoustical finish material. Part of the renovation work was completed during the summer of 2018, and the rest will be finished in the  summer of 2019.
 
The existing school building was expanded on the east wing and the west wing. On the east, we added a 4,900-square-foot classroom pod addition, and on the west, we added a 3,500-square-foot addition for music rooms. The additions are built on a load-bearing spread footing foundation system and have a structural metal stud building frame system. The expansion was completed in August 2018.
 
Site development included overlot grading, utilities, landscaping, and storm water system.
 